About the Project
Creation of modern, comfortable, ecological, charming housing is a constant priority of the company. We believe that a person should feel at home upon entering a newly purchased apartment. This is the vision for the new residential complex NCD Vashlijvari in Tbilisi. The complex is being built in Saburtalo District, a couple of kilometers from Lisi Lake; address - 29-a, Valentin Topuridze St.
When selecting a place for the residential complex, we took into account important issue of transport accessibility - the land plot is located on the fast-developing infrastructural axis connecting Saburtalo and Digmi - between Marshal Gelovani Avenue and Metro Delisi.
Two 9 and 10 storey buildings are designed on 2330 sq. m. land plot; The clients are not limited in their choice of apartments since the selection is diverse and ranges between 39 sq.m. and 117.1 sq.m. apartments; Every apartment has a balcony.
The undoubted advantage of the apartments is the panoramic view over the capital eastwards, and over the natural landscape to the west.
A garden square of 6.687 sq. m. has been built on the territory of the complex including:
-
Garden square in Japanese style
-
Pool with a fountain and aquatic plants
-
Playground
-
Gym equipment set up in the garden square
-
Pergola with seats.
The future residents will be able to enjoy additional infrastructure facilities:
-
2-level underground car parking;
-
Chain grocery store;
-
Other commercial sites.
The apartments are equipped with acoustic and heat insulation. High-quality, certified, environmentally friendly construction and finishing materials and modern construction technologies are used.
Construction Deadlines:
-
The construction of the first building was completed in 2020;
-
The construction of the second building will be completed in the spring of 2023.
The construction stage - handover of the second building:
The apartment is delivered to the future tenant in "green frame" condition (fit out), which entails the following:
-
steel front door;
-
PVC stained glass windows and doors;
-
internal plastered partitions built with light construction blocks (excluding WC facilities);
-
floor screed (excluding WC facilities);
-
heating pipework for radiators;
-
electrical connections;
-
main drain-waste-vent system;
-
installed natural gas line, which is ready to be used for the boiler or other gas appliances;
-
finished balcony;
-
installed gas, water and electricity meters, wiring for smoke detectors.